House demolition cost in Sydney (2026)

Prices checked November 2026

A full house demolition typically costs about $25,000, in a range of $12,000 to $40,000 for a standard block. Single-storey timber or fibro is about $15,000 to $22,000, brick veneer about $18,000 to $30,000, double storey about $25,000 to $50,000. Bonded asbestos adds about $1,500 to $10,000. Request a written quote from a local demolisher.

01

What does demolition cost?

Indicative price ranges, Australian bands, per job unless stated
JobScopeIndicative range
Full houseTypical house, standard block$12,000 – $40,000
Single storeyTimber or fibro, 3 bed, no significant asbestos$15,000 – $22,000
Single storeyBrick veneer, 3 bed, no asbestos$18,000 – $30,000
Double storeyAny wall material$25,000 – $50,000
By floor areaPer square metre$40 – $150
AsbestosBonded, inside a demolition quote$1,500 – $10,000
Concrete poolFull removal$8,000 – $18,000
Single garageNo asbestos$3,000 – $6,000
Concrete slabPer square metre, with disposal$55 – $95
02

Estimate your demolition cost

AWhat is the house built from?
BHow many storeys?
CIs there asbestos?

Site notice / indicative price

  • Permits: several weeks
  • On site: from 1 day
  • All-up: about 2 months
03

What moves the price of a demolition?

04

Demolish or strip out to the frame?

A whole-house strip-out to the frame is about $8,000 to $20,000. A full demolition is about $12,000 to $40,000. The strip-out keeps the frame for a renovation. If your builder needs a clear lot for a new house, only a full demolition will do.

05

More questions about demolition cost

Why do demolition quotes differ so much?

Quotes differ because houses and lots differ. Storeys, wall material, asbestos, access for machines, slab and services all move the price, and so does what each quote leaves out. A full house runs about $12,000 to $40,000. Compare line by line, not only the total.

Does a pool add to the demolition cost?

Yes. Removing a concrete in-ground pool completely is about $8,000 to $18,000, typically $12,000. Partial removal and fill-in is about $5,000 to $10,000. A fibreglass pool is about $7,000 to $18,000. Tell your demolisher about the pool in the quote flow so it is priced up front.

What does disconnecting services cost?

Disconnecting electricity, gas, water and sewer is about $1,000 to $3,000, typically $2,000, for the job. Services are capped before a house comes down, and your demolisher or the service providers handle it. Ask whether the disconnections are inside your quote or a separate line.

Are permit and certifier fees in the price?

Usually not. The published cost guides do not price permit, council or certifier fees, so treat those as extra and ask for them separately. A demolition quote may cover only the physical work. Ask your demolisher what approvals they handle and which you arrange yourself.

Is GST included in demolition prices?

Most published sources do not state whether GST is included, so the figures here are indicative bands only. Ask every demolisher whether their written quote includes GST, and get the answer in writing before you compare two quotes side by side.

Does it cost less to strip a house than knock it down?

A whole-house internal strip-out to the frame is about $8,000 to $20,000, typically $10,000, against $12,000 to $40,000 for a full demolition. A strip-out keeps the frame standing, so it only suits a renovation. It does not clear a lot for a new build.

Clear the block. Get your quote.

Privacy

We collect your name, mobile, email and the answers you give so we can arrange your quote.

With your consent, we pass them to one local demolisher, who may contact you about this job. We do not sell them to anyone else.

To ask us to see or delete your details, reply to any message we send you.

Work with us