Plumbline

restumping and reblocking · northern melbourne

Level floors.Written quote.

Answer five taps about your house. One independent local restumper comes back with a written quote for restumping or reblocking.

Fig. 1Pick a stump and a house size. The floor settles level.
DATUM – H

Stump

House

Melbourne metro prices, GST included. Checked November 2026.

What are you seeing in the house?

Tap the closest one to start your quote.

How does it work?

  1. 1

    Answer five taps

    The problem, the house, the stumps, the size and the timing.

  2. 2

    A local restumper reviews it

    One independent registered builder in your area looks at your answers.

  3. 3

    You get a written quote

    You see the price in writing before you commit to anything.

What does restumping include?

Which suburb is the house in?

Tap your suburb to start your quote.

Site plan

Restumping questions, answered

How much does restumping cost in northern Melbourne?

Most full-house reblocks in Melbourne cost $8,400 to $27,300, and a partial restump of 5 to 10 stumps costs $2,300 to $5,900. The price moves with the number of stumps, the room under the floor, the soil and any rotted bearers. Tell us about your house and one restumper will come back with a written quote.

What is the difference between restumping and reblocking?

In Victoria they are one trade: the builder registration category is called Reblocking and Restumping. Both mean replacing the stumps under a timber floor and levelling the floor again. A partial job swaps only the stumps that need it. A full job replaces them all.

What are the signs a house needs restumping?

Common signs are sloping floors, a marble that rolls, a bounce underfoot, doors that catch or swing open, and diagonal cracks from door or window corners. A fall of about 20 to 30 mm across one room is more concerning than a few millimetres. A subfloor inspection is how you know for certain.

How long does restumping take?

A standard three-bedroom house with underfloor access takes about 4 to 7 working days. Through-floor reblocking on low-clearance terraces takes about 7 to 12 working days. Your builder gives you a start date and a finish estimate in the quote, so you can plan around the floor being up.

Do I need a building permit to restump a house in Victoria?

Restumping generally needs a building permit from a registered building surveyor, because it is structural work under the Building Act 1993. The permit should be in place before work starts. Permit, engineering and soil report costs are $1,250 to $4,000 a job, so ask whether your quote includes them.

Who can restump a house in Victoria?

The builder needs to be a Victorian Building Authority registered practitioner, in category DB-U or DB-L (Reblocking and Restumping). Ask for the registration number and check it on the VBA register before you sign. Plumbline arranges your job with an independent local restumper who holds the right registration.

Should I choose concrete, steel or timber stumps?

The supply price per stump differs: concrete $190 to $505, adjustable steel $250 to $670 and treated hardwood $170 to $420. An adjustable steel stump can be re-levelled later without excavation, while a concrete stump cannot be adjusted once set. Your builder recommends one for your soil and floor.

How many stumps does a house have?

A 2 to 3 bedroom weatherboard has about 15 to 25 stumps, and a standard 3 to 4 bedroom home about 25 to 40. A partial job replaces 5 to 10. Your builder counts them at the inspection, because spacing depends on the floor frame and where the bearers sit.

What does a subfloor inspection cost?

A subfloor inspection and report costs about $300 to $900 and takes 1 to 3 hours. It looks at stump condition, bearers, drainage and clearance. Ask whether the inspection is included in your quote before you book a separate one, so you do not pay for it twice.

Does reactive clay soil change the price?

Yes. Reactive clays in Melbourne's north and west (AS 2870 classes H1, H2 and E) may need deeper footings and adjustable stumps, which adds cost. The soil class sets the footing size and depth. A soil report sits inside the $1,250 to $4,000 permit and engineering line.

Will restumping crack my plaster or walls?

Lifting a floor can crack plaster and cornices, and rigid pipes may need a licensed plumber. Make-good for plaster, cornice, doors and painting is often left out of quotes. Ask your restumper exactly what is included, and get it in writing before the work starts.

How much deposit can a builder ask for in Victoria?

A deposit is capped at 10% for jobs under $20,000 and 5% for jobs of $20,000 or more. Contracts over $10,000 need a written major domestic building contract. Read the contract before you sign, and do not pay more than the cap up front.

Is there a warranty on restumping?

One Victorian price guide gives a typical structural guarantee of 6 years for partial and full restumping. Ask for the warranty in writing in your contract, with what it covers and who stands behind it. Plumbline takes no payment from you, so the warranty is between you and the restumper.

Could an older house have asbestos?

Homes built before 1990 may contain asbestos, which must be identified before it is disturbed. Tell your builder when the house was built when you ask for a quote. They can then plan the work, and any testing, around it before the floor comes up.

Does a two-storey or low-clearance house cost more?

Yes. Complex, low-clearance or two-storey jobs run $21,000 to $42,000, against $13,650 to $27,300 for a standard 3 to 4 bedroom house. Clearance often drives the price more than stump count, because every stump is dug and set by someone working lying down.

Get the floor level. Request your quote.

Privacy

We collect your name, mobile, email and the answers you give so we can arrange your quote.

With your consent, we pass them to one local restumper who may contact you about this job. We do not sell them to anyone else.

To ask us to see or delete your details, reply to any message we send you.

Work with us